Install new generators and automatic transfer switches.
Remove and replace HVAC System, Auxiliary Power and Control Equipment.
Remove and replace metal roll-up doors, components, controls, and motors.
Remove and replace 300-ton air-cooled screw chiller and connected all hardware, software, associated piping chilled water piping.
Remove and replace Air Handling Unit, motors, and chiller pumps. Upgraded DDC system and water-cooled AC unit.
Remove and replace Split Heat Pump Systems.
Remove and replace the two (2) 7.5-Ton split systems and supporting utilities.
Provide all management, supervision, labor, tools, equipment, parts, supplies and all other services necessary to repair overhead, hangar, automatic, personnel doors and electric gates.
Install new bypass waterline, replace 10-inch gate valve and associated improvements.
Copyright © 2021 DLJ Management Services, LLC
2942 N 24th St, Ste 114 | Phoenix, AZ 85016
CONTACT (480) 236-5883